| Concreting In Hot Weather | ||
|---|---|---|
|
The problems When concreting in hot weather, it is important to prevent early loss of water from the concrete. Extremes of heat, wind and low humidity in combination or separately can cause concrete cracking and quick setting. In these conditions it is important to take precautions with Handling, Placing, Compaction, Finishing and Curing. If adequate precautions are not taken during the summer months, any of the following may occur:-
Note these points A) Setting times vary according to concrete temperature, cement type and on-site conditions. Check with your supplier regarding approximate setting times for the concrete specified. B) It is bad practice to place the concrete at excessive slumps, even at times of extreme heat. Good practice
1 Make sure the subgrade, reinforcing steel and formwork are moist before placing the concrete. If you don't, the water in the concrete will be sucked out, causing the concrete to crack. The night before saturate the base material
2 Place the concrete as soon as possible. Enough labour and equipment must be available to place concrete quickly as temperature build-up may result if the concrete is kept in the truck too long. Do not delay placing once the job has begun. 3 If using vibrators do not over vibrate. Depending on the depth of the concrete, 5 - 15 seconds should give the desired compaction. Inform the concrete supplier what type of concrete is required, where and how the concrete is to be placed.
5 Joints should be made correctly and at the required spacings to allow for any expansion and contractions that may occur. If cracking occurs while the concrete is still plastic, rework the concrete by recompaction 6 Place temporary damp covers over the fresh concrete immediately after screeding. When ready for floating or finishing, uncover only a small section immediately ahead of the finishers. Cover again as soon as possible and keep covers damp. Use a curing compound to prevent premature drying.
7 Start proper curing as soon as possible. Make sure that the temperature of the concrete stays as low as possible. Continuous curing for at least the first 3 to 7 days is essential in hot weather if you wish to minimise cracking and obtain adequate strength gain. Do not apply cold water to a hot concrete surface as thermal cracking may occur due to sudden cooling.
|